A private wildlife park in the Netherlands planned a walk-through aviary and a new primate viewing area, both on a tight spring opening schedule. The existing enclosures were built with galvanised chain-link, which had rusted along the ground line, produced sharp wire ends that injured birds, and obscured the view for visitors.
The park contacted Anping Yuhan Metal Wire Mesh Co., Ltd. through our export site in late 2025 with three fixed requirements: replace all bird-facing fencing with a non-corrosive material, keep the structure visually open, and complete delivery within 45 days so that installation could finish before the visitor season.
| Item | Requirement |
|---|---|
| Total area | 2,600 m² (aviary 1,850 m² + primate viewing 750 m²) |
| Material grade | AISI 316L, mill test certificate required |
| Rope / aperture | 2.0 mm rope, 7 × 7 construction, 40 × 40 mm aperture |
| Connection | Ferruled (hand-woven, no sharp ends) |
| Colour | Black, colour-matched to existing steelwork |
| Documents | CE and SGS reports for customs and park inspection |
| Delivery | 45 days, sea freight to Rotterdam |
We supplied 2,600 m² of 316L ferruled cable mesh, produced on 2 m × 3 m modular panels with a set of custom trapezoid and curved panels to follow the aviary dome. Each panel was fitted with stainless thimbles and edge-locked ferrules, and shipped with matching 316 tensioners, clamps and wire-rope cross-clips so that no mixed-grade hardware could reach the site.
| Metric | Before (chain-link) | After (316L cable mesh) |
|---|---|---|
| Replacement cycle | Every 5–6 years | Service life 15–20 years estimated |
| Annual maintenance | Rust treatment and panel repairs each season | Visual inspection only |
| Bird injuries from fencing | Reported each season | None reported in the first season |
| Visitor visibility | Wire grid interrupted sightlines | Open view, mesh reads as transparent |
| Installation time | — | 9 working days, no on-site cutting |
“The mesh arrived numbered to our drawings, which saved us at least a week on site. Visitors immediately noticed how much clearer the aviary looks, and our keepers no longer find damaged wire,” said the park's technical coordinator. The park has since requested a quotation for a second phase covering the bird-of-prey flight cage.
Three decisions made the difference: specifying 316L instead of 304 for a humid coastal climate, keeping mesh and hardware in one grade, and committing to a fixed delivery window with documentation prepared in advance. Buyers planning similar aviary or architectural projects can request a panel layout drawing and specification sheet before placing an order.
![]()
![]()
![]()